Customization: | Available |
---|---|
Condition: | New |
Certification: | CE, RoHS, GS, ISO9001 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
IMAGE | Product characteristic |
1) Surface with galvanized protect the channel from being rust 2) Flexible suspension system makes each ceiling tile easily installed and disconnected 3) Profile size adjustable, can be made in your requiring size 4) long time service life. 5)With high tensil stress and blening stress 6)Well adapted in the market |
VALUE | UNIT | TOLERANCE | IMAGE | ||
FURRING CHANNEL | |||||
DIAMENSION | A | 68 | MM | +-0.1 | |
B | 43 | MM | +-0.1 | ||
C | 22 | MM | +-0.1 | ||
D | 12 | MM | +-0.1 | ||
THICKNESS | 0.35~1 | MM | +-0.02 | ||
DESCRIPSION | ON C SIDE WITH DOTS, OTHER SIDE IS PLAIN | ||||
WALL CHANNEL | |||||
DIAMENSION | A | 25 | MM | +-0.1 | |
24 | MM | +-0.1 | |||
30 | MM | +-0.1 | |||
B | 25 | MM | +-0.1 | ||
24 | MM | +-0.1 | |||
30 | MM | +-0.1 | |||
THICKNESS | 0.35~1 | MM | +-0.02 | ||
DESCRIPSION | SURFACE WITH DOTS ,PLAIN OR WITH HOLES | ||||
C CHANNEL | |||||
DIAMENSION | A | 38 | MM | +-0.1 | |
B | 12 | MM | +-0.1 | ||
10 | MM | +-0.1 | |||
THICKNESS | 0.35~1 | MM | +-0.02 | ||
DESCRIPSION | |||||
STUD | |||||
DIAMENSION | A | 50 | MM | +-0.1 | |
B | 48 | MM | +-0.1 | ||
A1 | 63 | MM | +-0.1 | ||
B1 | 31 | MM | +-0.1 | ||
A2 | 75 | MM | +-0.1 | ||
B2 | 48 | MM | +-0.1 | ||
A3 | 100 | MM | +-0.1 | ||
B3 | 48 | MM | +-0.1 | ||
THICKNESS | 0.35~1 | MM | +-0.02 | ||
DESCRIPSION | 1.WITH HEM ON B SIDE , 2.CAN WITH H HOLE ON A SIDE | ||||
TRACK | |||||
DIAMENSION | A | 50 | MM | +-0.1 | |
B | 40 | MM | +-0.1 | ||
A1 | 63 | MM | +-0.1 | ||
B1 | 25 | MM | +-0.1 | ||
A2 | 75 | MM | +-0.1 | ||
B2 | 40 | MM | +-0.1 | ||
A3 | 100 | MM | +-0.1 | ||
B3 | 40 | MM | +-0.1 | ||
THICKNESS | 0.35~1 | MM | +-0.02 | ||
DESCRIPSION | |||||
Zine coated standard | 40~185g/m2 | ||||
Adopted Market | Mid-East; Russia; Austrial; Africa; South Africa | ||||
Production Ability | 1040 Tons/ Month | ||||
Zine coated treatment | Hot Dip |
IMAGE | ACCESSORIES |
GI DRYWALL SYSTEM | |
METAL STUD: 1PCS/M2 METAL TRACK:0.334PCS/M2 CONEER BEAD:0.2PCS/M2 BOARD BEAD:0.2PCS/M2 |
|
GI PROFILE CEILING SYSTEM | |
Main grid:0.334PCS/M2 WALL ANGLE:0.2PCS/M2 FURRING CHANNEL:1PCS/M2 HANGER:2SET/M2 WIRE CLIP:8PCS/M2 |
INSTALLATION METHOD | |
Screw lengths of track to the floor and ceiling. Tracks are slightly wider than studs, so studs snap right in. | |
To trim to correct length, cut both side flanges of a steel stud, using straight-cut aviation snips. Then bend one flange up and cut across the stud's web. |
|
Join studs to tracks by clamping the two members tightly with a C-clamp locking pliers and driving a pan-head screw in the middle where they meet. - Drive the screws at medium speed. - Choose a clutch setting strong enough to drive the screw home, but not so strong that it strips the screw hole and weakens the joint. |
|
Secure electrical cable along the center line of each stud with plastic ties screwed to the studs. Pop a plastic bushing into each knockout to keep the cable from rubbing against the sharp edges. | |
Add wood nailers as needed for doors, windows and cabinets. - Hang drywall or sheathing using 3.1 cm self-tapping drywall screws spaced every 20.3 cm along edges (where two sheets meet on a stud) and 30.5 cm on center elsewhere. - Check local building codes. They may require screws placed closer together, and having too many screws is preferable to having to add more after the inspector comes. |